Files
bid-doctor/docs/analysis/README.md
YANG JIANKUAN e29c40ec41 docs: 新增 PRD v0.9.1、决策记录与 MVP 需求分析
- PRD v0.9.1:补充政府采购体系依据(87 号令),异常低价口径按体系分层
- decisions.md:D1 首发 IT 集成、A1 需求分析 G1–G10、T1 国产云端模型路由
- docs/analysis:范围与角色、用户旅程、功能需求、领域模型、
  IT 集成领域知识、缺口清单、苏采云样本分析

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-02 18:23:05 +08:00

33 lines
2.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# 需求分析(MVP · IT 集成)
> 阶段:需求分析 · 2026-11-02 · 依据:PRD v0.9 + D1(IT 集成先行)
| 文档 | 内容 |
|---|---|
| [01-scope-roles.md](01-scope-roles.md) | MVP 范围边界、角色、计费口径 |
| [02-user-journeys.md](02-user-journeys.md) | 五条用户旅程(首次体验、真实项目迭代、额度、删除、反馈) |
| [03-functional-requirements.md](03-functional-requirements.md) | 功能需求和验收标准(FR-M2 / M3 / M6) |
| [04-domain-model.md](04-domain-model.md) | 领域模型、状态机、关键设计约束 |
| [05-it-integration-domain.md](05-it-integration-domain.md) | IT 集成领域知识:法律体系、提取 schema、M3 规则种子 R01–R19 |
| [06-gaps-and-questions.md](06-gaps-and-questions.md) | PRD 缺口与待确认问题 G1–G15 |
| [07-sample-findings.md](07-sample-findings.md) | 苏采云 10 份样本分析:实质性条款标注、文件格式、报价规则等 F1–F10 |
## 主要发现
1. **IT 集成多数走政府采购体系**,PRD 的政策依据只覆盖招标投标体系,产品要先识别项目适用的体系(G1)。
2. **87 号令第 60 条已经规定了异常低价无效**,PRD 把它归为「草案层」,对政府采购项目来说不准确,对外宣传的口径要改(G2)。
3. **MVP 跑通还缺四块**:多包、最小资质库、报价形式检查、运营后台(G3、G4、FR-M3-06、G13)。
4. **「项目检查清单」要有版本、有出处、按包划分**,它是全产品数据设计的核心(04)。
5. **最大的技术风险**:★ 条款召回率、原文回链准确率、签章检测、模型合规(G11、G12)。建议先收集 5–10 份公开的 IT 集成招标文件做语料(05 §6)。
## 决策状态
- 2026-11-02:G1–G10 全部按建议确认(`docs/decisions.md` A1);G2 已出 PRD v0.9.1。
- 2026-11-02:大模型策略定为国产云端模型 + 按场景路由(T1)。
## 下一步
1. ~~收集样本语料~~:第一批 10 份已入库(`samples/tenders/`),结论见 07。后续补扫描件、补遗、招标投标体系的样本,并人工标注实质性条款。
2. 进入主题 / 品牌设计和原型设计(原型样例数据改用真实样本 S10,它有 3 个采购包)。
3. 技术架构:模型路由层、文档规范化与出处定位、签章检测可行性(G12)。