- evals/gold:1,887 个标注单元(AI 标注、逐条裁定,未经人工复核),规范见 GUIDELINES.md - prepare / run_all / score / gold:导出文字层、批量抽取、打分、标注定位 - docs/architecture/extract-eval.md:修复前后的结果(三项目标全部达标)和剩余问题 - decisions.md 记 M1(只用 Flash)和 Q1–Q4;架构 §13 SK13;AGENTS.md 进度 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
1987 lines
42 KiB
JSON
1987 lines
42 KiB
JSON
{
|
||
"doc": "S09",
|
||
"annotator": "claude-subagent",
|
||
"reviewed": false,
|
||
"notes": [
|
||
"竞争性磋商(苏采云),术语为响应文件/无效响应;但第四章 p52 承诺函注释和第五章异常低价审查用了「投标人/无效投标」。",
|
||
"标注规则(p13 24.3.6、p83、p84 偏离表备注)声明「斜体且有下划线」或「★」为实质性要求;全文实际没有任何带 ★ 的条款,带 <iu> 的只有 p52 两句(响应时间与人员配置、承诺函)。",
|
||
"无效情形集中在须知 24.3(上级「未实质性响应磋商文件的情形」+ 24.4 按无效响应处理);第五章没有资格审查表、符合性审查表,资格条件只在公告和 24.3.4 / 24.3.7。",
|
||
"24.3.6 是兜底并含标注说明,记为 optional;24.3.12 兜底未标。26.4 取消成交资格各项按「成交无效」记 optional;公告「拒绝下述供应商参加」的 1、2 项记 optional 的 explicit_invalid(另记资格条件)。",
|
||
"第五章评分表被切成多列碎片(评分因素名、分值、序号混在句子里),anchors 用各档次(优/良/中/差)开头的句子;2.12 优档前有 **Expressionisfaulty** 杂字。",
|
||
"合同附件考核表(p25–28)与第四章 p57–61 的考核表重复,都属履约考核,不标。没有开标(磋商)时间地点的条款。",
|
||
"技术参数抽样范围取第四章 p32(服务总体要求)到 p55(响应/处理时间表),p56 起是考核及付款,不含;p41 后半页和 p46 前半页是设备清单,不标;p50 响应策略表、p55 时间表按行各一个单元,片段跨多格。",
|
||
"代理机构名称在 p2 被拼成「…有限公司日」,以 p7 的写法为准。"
|
||
],
|
||
"marking": {
|
||
"markers": [
|
||
"star",
|
||
"italic_underline"
|
||
],
|
||
"declared_count": null
|
||
},
|
||
"project_info": {
|
||
"name": "2026-2027年江苏省教育信息化与数据管理中心支撑服务",
|
||
"code": "JSZC-320000-HWZX-C2026-0687",
|
||
"purchaser": "江苏省教育信息化与数据管理中心",
|
||
"agency": "江苏海外集团国际工程咨询有限公司",
|
||
"procurement_method": "竞争性磋商",
|
||
"legal_regime": "gov_procurement",
|
||
"budget_total": {
|
||
"value": "203.2",
|
||
"unit": "万元"
|
||
},
|
||
"ceiling_total": {
|
||
"value": "203.2",
|
||
"unit": "万元"
|
||
},
|
||
"eval_method": "综合评分法",
|
||
"accept_consortium": true,
|
||
"accept_imported": null,
|
||
"sme_only": false
|
||
},
|
||
"lots": [],
|
||
"tech_param_pages": [
|
||
32,
|
||
37,
|
||
41,
|
||
46,
|
||
50,
|
||
55
|
||
],
|
||
"items": [
|
||
{
|
||
"id": "s1",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "在苏采云系统规定的时间内未成功解密电子响应文件"
|
||
}
|
||
],
|
||
"note": "未在规定时间内成功解密响应文件"
|
||
},
|
||
{
|
||
"id": "s2",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "供应商未按照磋商文件要求上传电子响应文件"
|
||
},
|
||
{
|
||
"p": 10,
|
||
"t": "因供应商自身原因造成的电子响应文件上传不成功的"
|
||
}
|
||
],
|
||
"note": "须按要求成功上传电子响应文件"
|
||
},
|
||
{
|
||
"id": "s3",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "同一供应商提交两个(含两个)以上不同的响应文件"
|
||
}
|
||
],
|
||
"note": "不得提交两份以上不同响应文件或最后报价"
|
||
},
|
||
{
|
||
"id": "s4",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "供应商不具备磋商文件中规定的资格要求"
|
||
}
|
||
],
|
||
"note": "须具备规定的资格要求"
|
||
},
|
||
{
|
||
"id": "s5",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "供应商的最后报价超过了采购预算或最高限价"
|
||
}
|
||
],
|
||
"note": "最后报价不得超过预算或最高限价"
|
||
},
|
||
{
|
||
"id": "s6",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "不符合磋商文件中规定的实质性要求和条件"
|
||
}
|
||
],
|
||
"note": "须符合实质性要求和条件(兜底,含标注说明)",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "s7",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "列入失信被执行人或重大税收违法案件当事人名单"
|
||
},
|
||
{
|
||
"p": 6,
|
||
"t": "列入失信被执行人、重大税收违法案件当事人名单、政府采购严重违法失信行为记录名单"
|
||
}
|
||
],
|
||
"note": "不得被列入失信被执行人等信用黑名单"
|
||
},
|
||
{
|
||
"id": "s8",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "响应文件含有采购人不能接受的附加条件"
|
||
}
|
||
],
|
||
"note": "不得含采购人不能接受的附加条件"
|
||
},
|
||
{
|
||
"id": "s9",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "供应商不能证明其报价合理性的,磋商小组应当将其作为无效响应处理"
|
||
},
|
||
{
|
||
"p": 13,
|
||
"t": "报价明显低于其他通过符合性审查供应商的报价"
|
||
},
|
||
{
|
||
"p": 63,
|
||
"t": "不能证明其报价合理性的,评审委员会应当将其作为无效投标处理"
|
||
}
|
||
],
|
||
"note": "异常低价须证明报价合理性"
|
||
},
|
||
{
|
||
"id": "s10",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "列入“节能产品品目清单”强制采购范围"
|
||
}
|
||
],
|
||
"note": "强制采购节能产品须在清单范围内"
|
||
},
|
||
{
|
||
"id": "s11",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "响应文件未按照磋商文件要求加盖电子公章"
|
||
}
|
||
],
|
||
"note": "响应文件须按要求加盖电子公章"
|
||
},
|
||
{
|
||
"id": "s12",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 10,
|
||
"t": "磋商有效期比规定短的将被视为非实质性响应磋商文件而被拒绝"
|
||
}
|
||
],
|
||
"note": "磋商有效期不得短于规定"
|
||
},
|
||
{
|
||
"id": "s13",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 10,
|
||
"t": "提交响应文件截止时间后上传的任何响应文件将被拒绝"
|
||
}
|
||
],
|
||
"note": "截止时间后上传的响应文件被拒收"
|
||
},
|
||
{
|
||
"id": "s14",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 11,
|
||
"t": "供应商不得以任何方式影响评审过程,否则其响应文件将被作为无效响应文件"
|
||
}
|
||
],
|
||
"note": "不得影响评审过程"
|
||
},
|
||
{
|
||
"id": "s15",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 14,
|
||
"t": "供应商未在磋商小组规定的时间内在苏采云系统中提交最后报价的视为放弃磋商"
|
||
}
|
||
],
|
||
"note": "按时提交最后报价且报价表加盖电子公章"
|
||
},
|
||
{
|
||
"id": "s16",
|
||
"cat": "substantive",
|
||
"basis": "italic_underline",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "服务提供商必须满足服务响应时间、人员配置的要求"
|
||
}
|
||
],
|
||
"note": "须满足服务响应时间、人员配置要求"
|
||
},
|
||
{
|
||
"id": "s17",
|
||
"cat": "substantive",
|
||
"basis": "italic_underline",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "投标人须针对以上内容提供承诺函并加盖公章,上传至符合性审查节点"
|
||
}
|
||
],
|
||
"note": "响应时间人员配置承诺函上传符合性审查节点"
|
||
},
|
||
{
|
||
"id": "s18",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 6,
|
||
"t": "单位负责人为同一人或者存在直接控股、管理关系的不同供应商"
|
||
}
|
||
],
|
||
"note": "拒绝负责人同一人或控股管理关系的供应商",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "s19",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 6,
|
||
"t": "为采购项目提供整体设计、规范编制或者项目管理、监理、检测等服务的供应商"
|
||
}
|
||
],
|
||
"note": "拒绝为本项目提供设计监理等服务的供应商",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "s20",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 15,
|
||
"t": "26.4.1提供虚假材料谋取成交"
|
||
}
|
||
],
|
||
"note": "提供虚假材料取消成交资格",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "s21",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 15,
|
||
"t": "向评审专家、采购人或采购代理机构工作人员行贿"
|
||
}
|
||
],
|
||
"note": "行贿取消成交资格",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "s22",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 15,
|
||
"t": "与其他供应商、评审专家、采购人或采购代理机构工作人员恶意串通"
|
||
}
|
||
],
|
||
"note": "恶意串通取消成交资格",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "s23",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 15,
|
||
"t": "不满足本磋商文件规定的实质性要求,但在评审过程中未被磋商小组发现"
|
||
}
|
||
],
|
||
"note": "不满足实质性要求未被发现的取消成交资格",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "s24",
|
||
"cat": "substantive",
|
||
"basis": "explicit_invalid",
|
||
"anchors": [
|
||
{
|
||
"p": 15,
|
||
"t": "采取不正当手段诋毁、排挤其他供应商"
|
||
}
|
||
],
|
||
"note": "诋毁排挤其他供应商取消成交资格",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "q1",
|
||
"cat": "qualification",
|
||
"anchors": [
|
||
{
|
||
"p": 5,
|
||
"t": "满足《中华人民共和国政府采购法》第二十二条规定"
|
||
},
|
||
{
|
||
"p": 5,
|
||
"t": "法人或者其他组织的营业执照等证明文件,自然人的身份证明"
|
||
}
|
||
],
|
||
"note": "满足第二十二条;营业执照等主体证明"
|
||
},
|
||
{
|
||
"id": "q2",
|
||
"cat": "qualification",
|
||
"anchors": [
|
||
{
|
||
"p": 5,
|
||
"t": "上一年度的财务状况报告(成立不满一年无需提供)"
|
||
}
|
||
],
|
||
"note": "上一年度财务状况报告"
|
||
},
|
||
{
|
||
"id": "q3",
|
||
"cat": "qualification",
|
||
"anchors": [
|
||
{
|
||
"p": 5,
|
||
"t": "依法缴纳税收和社会保障资金的相关材料"
|
||
},
|
||
{
|
||
"p": 5,
|
||
"t": "供应商依法享受缓缴、免缴税收、社会保障资金的提供证明材料"
|
||
}
|
||
],
|
||
"note": "依法纳税和缴纳社保证明"
|
||
},
|
||
{
|
||
"id": "q4",
|
||
"cat": "qualification",
|
||
"anchors": [
|
||
{
|
||
"p": 5,
|
||
"t": "具备履行合同所必需的设备和专业技术能力的书面声明"
|
||
}
|
||
],
|
||
"note": "具备履约设备和专业技术能力声明"
|
||
},
|
||
{
|
||
"id": "q5",
|
||
"cat": "qualification",
|
||
"anchors": [
|
||
{
|
||
"p": 5,
|
||
"t": "参加政府采购活动前3年内在经营活动中没有重大违法记录的书面声明"
|
||
}
|
||
],
|
||
"note": "前3年无重大违法记录声明"
|
||
},
|
||
{
|
||
"id": "q6",
|
||
"cat": "qualification",
|
||
"anchors": [
|
||
{
|
||
"p": 5,
|
||
"t": "本项目不专门面向中小微企业采购"
|
||
},
|
||
{
|
||
"p": 1,
|
||
"t": "(非专门面向中小企业)"
|
||
}
|
||
],
|
||
"note": "非专门面向中小企业"
|
||
},
|
||
{
|
||
"id": "q7",
|
||
"cat": "qualification",
|
||
"anchors": [
|
||
{
|
||
"p": 5,
|
||
"t": "本项目接受联合体参加磋商"
|
||
}
|
||
],
|
||
"note": "接受联合体"
|
||
},
|
||
{
|
||
"id": "q8",
|
||
"cat": "qualification",
|
||
"anchors": [
|
||
{
|
||
"p": 6,
|
||
"t": "单位负责人为同一人或者存在直接控股、管理关系的不同供应商"
|
||
}
|
||
],
|
||
"note": "负责人同一人或控股管理关系的不得同时参加"
|
||
},
|
||
{
|
||
"id": "q9",
|
||
"cat": "qualification",
|
||
"anchors": [
|
||
{
|
||
"p": 6,
|
||
"t": "为采购项目提供整体设计、规范编制或者项目管理、监理、检测等服务的供应商"
|
||
}
|
||
],
|
||
"note": "为本项目提供设计监理等服务的不得参加"
|
||
},
|
||
{
|
||
"id": "q10",
|
||
"cat": "qualification",
|
||
"anchors": [
|
||
{
|
||
"p": 6,
|
||
"t": "列入失信被执行人、重大税收违法案件当事人名单、政府采购严重违法失信行为记录名单"
|
||
},
|
||
{
|
||
"p": 12,
|
||
"t": "在“信用中国”网站(www.creditchina.gov.cn)查询供应商的信用记录"
|
||
},
|
||
{
|
||
"p": 12,
|
||
"t": "联合体成员存在不良信用记录的,视同联合体存在不良信用记录"
|
||
},
|
||
{
|
||
"p": 13,
|
||
"t": "列入失信被执行人或重大税收违法案件当事人名单"
|
||
}
|
||
],
|
||
"note": "信用记录:不得列入失信等名单"
|
||
},
|
||
{
|
||
"id": "c1",
|
||
"cat": "scoring",
|
||
"points": "15",
|
||
"anchors": [
|
||
{
|
||
"p": 64,
|
||
"t": "为评标基准价,其价格分为满分"
|
||
},
|
||
{
|
||
"p": 64,
|
||
"t": "投标报价得分=(评标基准价/投标报价)×15"
|
||
},
|
||
{
|
||
"p": 64,
|
||
"t": "满足招标文件要求且投标价格最低的投标报"
|
||
}
|
||
],
|
||
"note": "价格分:低价优先法"
|
||
},
|
||
{
|
||
"id": "c2",
|
||
"cat": "scoring",
|
||
"points": "10%",
|
||
"anchors": [
|
||
{
|
||
"p": 61,
|
||
"t": "本项目服务全部由小微企业承接的,对报价给予10%的扣除"
|
||
}
|
||
],
|
||
"note": "小微企业价格扣除10%"
|
||
},
|
||
{
|
||
"id": "c3",
|
||
"cat": "scoring",
|
||
"points": "10%",
|
||
"anchors": [
|
||
{
|
||
"p": 61,
|
||
"t": "残疾人福利性单位视同小型、微型企业,给予与小微企业相同的价格扣除"
|
||
}
|
||
],
|
||
"note": "残疾人福利性单位同等价格扣除"
|
||
},
|
||
{
|
||
"id": "c4",
|
||
"cat": "scoring",
|
||
"points": "10%",
|
||
"anchors": [
|
||
{
|
||
"p": 61,
|
||
"t": "监狱和戒毒企业视同小型、微型企业,给予与小微企业相同的价格扣除"
|
||
}
|
||
],
|
||
"note": "监狱企业同等价格扣除"
|
||
},
|
||
{
|
||
"id": "c5",
|
||
"cat": "scoring",
|
||
"points": "6%",
|
||
"anchors": [
|
||
{
|
||
"p": 61,
|
||
"t": "合同份额占合同总金额30%以上的,给予联合体或者大中型企业报价6%的扣除"
|
||
}
|
||
],
|
||
"note": "联合体/分包小微份额≥30%扣除6%"
|
||
},
|
||
{
|
||
"id": "c6",
|
||
"cat": "scoring",
|
||
"points": "10%",
|
||
"anchors": [
|
||
{
|
||
"p": 61,
|
||
"t": "联合体各方均为小型、微型企业(或残疾人福利性单位、监狱企业)的,给予与小"
|
||
},
|
||
{
|
||
"p": 61,
|
||
"t": "微企业相同的价格扣除,用扣除后的价格参与评审"
|
||
}
|
||
],
|
||
"note": "联合体各方均为小微企业同等扣除"
|
||
},
|
||
{
|
||
"id": "c7",
|
||
"cat": "scoring",
|
||
"points": "4",
|
||
"anchors": [
|
||
{
|
||
"p": 64,
|
||
"t": "①优得4分:要求方案完整覆盖机房设备维保"
|
||
},
|
||
{
|
||
"p": 64,
|
||
"t": "②良得2分:要求完整覆盖五大业务模块"
|
||
},
|
||
{
|
||
"p": 64,
|
||
"t": "③中得1分:要求方案能够覆盖项目核心服务内容"
|
||
},
|
||
{
|
||
"p": 64,
|
||
"t": "④差得0分:未提供整体服务方案"
|
||
},
|
||
{
|
||
"p": 64,
|
||
"t": "完整性"
|
||
}
|
||
],
|
||
"note": "整体方案完整性"
|
||
},
|
||
{
|
||
"id": "c8",
|
||
"cat": "scoring",
|
||
"points": "3",
|
||
"anchors": [
|
||
{
|
||
"p": 64,
|
||
"t": "①优得3分:要求提供两项及以上贴合江苏省教育信息化业务"
|
||
},
|
||
{
|
||
"p": 64,
|
||
"t": "2.2增值服务"
|
||
},
|
||
{
|
||
"p": 64,
|
||
"t": "②良得2分:要求提供一项完整、具备落地细则的增值服务"
|
||
},
|
||
{
|
||
"p": 64,
|
||
"t": "③中得1分:仅罗列增值服务名称"
|
||
},
|
||
{
|
||
"p": 64,
|
||
"t": "④差得0分,未提供任何增值服务内容"
|
||
}
|
||
],
|
||
"note": "增值服务"
|
||
},
|
||
{
|
||
"id": "c9",
|
||
"cat": "scoring",
|
||
"points": "3",
|
||
"anchors": [
|
||
{
|
||
"p": 65,
|
||
"t": "①优得3分:要求维保方案完整覆盖需求书中全部交换机"
|
||
},
|
||
{
|
||
"p": 65,
|
||
"t": "②良得2分:完整覆盖项目全部设备资产清单"
|
||
},
|
||
{
|
||
"p": 65,
|
||
"t": "③中得1分:仅覆盖服务器、存储、核心交换机"
|
||
},
|
||
{
|
||
"p": 65,
|
||
"t": "④差得0分:未提供独立设备维保专项方案"
|
||
}
|
||
],
|
||
"note": "全设备维保覆盖方案"
|
||
},
|
||
{
|
||
"id": "c10",
|
||
"cat": "scoring",
|
||
"points": "3",
|
||
"anchors": [
|
||
{
|
||
"p": 65,
|
||
"t": "①优得3分:要求本地备件库存放备件的品类"
|
||
},
|
||
{
|
||
"p": 65,
|
||
"t": "②良得2分:备件清单完全匹配招标文件最低库存数量"
|
||
},
|
||
{
|
||
"p": 65,
|
||
"t": "③中得1分:仅简单罗列部分备件名称"
|
||
},
|
||
{
|
||
"p": 65,
|
||
"t": "④差得0分:未提供备品备件专项保障方案"
|
||
}
|
||
],
|
||
"note": "备品备件保障方案"
|
||
},
|
||
{
|
||
"id": "c11",
|
||
"cat": "scoring",
|
||
"points": "3",
|
||
"anchors": [
|
||
{
|
||
"p": 66,
|
||
"t": "①优得3分:方案完整覆盖信息系统等保定级"
|
||
},
|
||
{
|
||
"p": 66,
|
||
"t": "②良得2分:逐条响应采购文件全部安全规划"
|
||
},
|
||
{
|
||
"p": 66,
|
||
"t": "③中得1分:仅简单罗列安全咨询服务条目"
|
||
},
|
||
{
|
||
"p": 66,
|
||
"t": "④差得0分:无独立安全规划咨询专项方案"
|
||
}
|
||
],
|
||
"note": "安全规划和咨询服务"
|
||
},
|
||
{
|
||
"id": "c12",
|
||
"cat": "scoring",
|
||
"points": "3",
|
||
"anchors": [
|
||
{
|
||
"p": 66,
|
||
"t": "①优得3分:细化主机、网络、存储、安全设备全基线安全加固"
|
||
},
|
||
{
|
||
"p": 66,
|
||
"t": "②良得2分:完整落实安全加固、年度风险评估"
|
||
},
|
||
{
|
||
"p": 66,
|
||
"t": "③中得1分:仅简要说明加固、评估、测试基础服务名称"
|
||
},
|
||
{
|
||
"p": 66,
|
||
"t": "④差得0分:未提供本专项完整方案"
|
||
}
|
||
],
|
||
"note": "安全加固、风险评估、系统测试服务"
|
||
},
|
||
{
|
||
"id": "c13",
|
||
"cat": "scoring",
|
||
"points": "3",
|
||
"anchors": [
|
||
{
|
||
"p": 66,
|
||
"t": "①优得3分:清晰列明0.5小时远程应急响应"
|
||
},
|
||
{
|
||
"p": 66,
|
||
"t": "②良得2分:完整响应招标文件应急响应"
|
||
},
|
||
{
|
||
"p": 66,
|
||
"t": "③中得1分:仅列明应急处置、重保服务名称"
|
||
},
|
||
{
|
||
"p": 66,
|
||
"t": "④差得0分:无应急及重保专项方案"
|
||
}
|
||
],
|
||
"note": "应急响应、重要时期安全保障服务"
|
||
},
|
||
{
|
||
"id": "c14",
|
||
"cat": "scoring",
|
||
"points": "3",
|
||
"anchors": [
|
||
{
|
||
"p": 67,
|
||
"t": "①优得3分:方案完整覆盖内网微隔离"
|
||
},
|
||
{
|
||
"p": 67,
|
||
"t": "②良得2分:完整落实网络、主机、应用、数据层面"
|
||
},
|
||
{
|
||
"p": 67,
|
||
"t": "③中得1分:系统防护、数据防护内容描述笼统模糊"
|
||
},
|
||
{
|
||
"p": 67,
|
||
"t": "④差得0分:未提供系统与数据防护专项方案"
|
||
}
|
||
],
|
||
"note": "系统防护、数据防护服务"
|
||
},
|
||
{
|
||
"id": "c15",
|
||
"cat": "scoring",
|
||
"points": "3",
|
||
"anchors": [
|
||
{
|
||
"p": 67,
|
||
"t": "①优得3分:运维方案全覆盖机房装饰、电气"
|
||
},
|
||
{
|
||
"p": 67,
|
||
"t": "②良得2分:完整覆盖招标文件列明的全部机房基础设施清单"
|
||
},
|
||
{
|
||
"p": 67,
|
||
"t": "③中得1分:仅覆盖机房空调、UPS、消防等核心设施"
|
||
},
|
||
{
|
||
"p": 67,
|
||
"t": "④差得0分:无独立基础环境运维专项方案"
|
||
}
|
||
],
|
||
"note": "基础环境运维服务"
|
||
},
|
||
{
|
||
"id": "c16",
|
||
"cat": "scoring",
|
||
"points": "3",
|
||
"anchors": [
|
||
{
|
||
"p": 67,
|
||
"t": "①优得3分:覆盖服务器、存储、光纤交换机、虚拟化平台"
|
||
},
|
||
{
|
||
"p": 67,
|
||
"t": "②良得2分:完整响应服务器、存储、网络、虚拟化"
|
||
},
|
||
{
|
||
"p": 67,
|
||
"t": "③中得1分:仅罗列IT硬件设备清单"
|
||
},
|
||
{
|
||
"p": 67,
|
||
"t": "④差得0分:无IT专业运维专项方案"
|
||
}
|
||
],
|
||
"note": "IT专业运维服务"
|
||
},
|
||
{
|
||
"id": "c17",
|
||
"cat": "scoring",
|
||
"points": "3",
|
||
"anchors": [
|
||
{
|
||
"p": 68,
|
||
"t": "①优得3分:方案包含办公网全链路分周期巡检"
|
||
},
|
||
{
|
||
"p": 68,
|
||
"t": "②良得2分:完整覆盖办公网日常巡检"
|
||
},
|
||
{
|
||
"p": 68,
|
||
"t": "③中得1分:仅简单说明办公网基础运维工作内容"
|
||
},
|
||
{
|
||
"p": 68,
|
||
"t": "④差得0分:未提供办公网络运维专项方案"
|
||
}
|
||
],
|
||
"note": "办公网络运维服务"
|
||
},
|
||
{
|
||
"id": "c18",
|
||
"cat": "scoring",
|
||
"points": "5",
|
||
"anchors": [
|
||
{
|
||
"p": 68,
|
||
"t": "优得5分:完整落地招标文件1000MIPv4"
|
||
},
|
||
{
|
||
"p": 68,
|
||
"t": "②良得4分:逐条响应教育网带宽、公网地址"
|
||
},
|
||
{
|
||
"p": 68,
|
||
"t": "③中得3分:能够覆盖大部分教育网络核心服务内容"
|
||
},
|
||
{
|
||
"p": 68,
|
||
"t": "④差得0分:未提供教育网络服务专项方案"
|
||
}
|
||
],
|
||
"note": "教育网络服务方案"
|
||
},
|
||
{
|
||
"id": "c19",
|
||
"cat": "scoring",
|
||
"points": "5",
|
||
"anchors": [
|
||
{
|
||
"p": 69,
|
||
"t": "①优得5分:驻场方案完全满足招标文件驻场人员不少于3人"
|
||
},
|
||
{
|
||
"p": 69,
|
||
"t": "②良得3分,完整响应招标文件驻场人员数量"
|
||
},
|
||
{
|
||
"p": 69,
|
||
"t": "③中得1分,仅简单列明驻场人员数量"
|
||
},
|
||
{
|
||
"p": 69,
|
||
"t": "④差得0分,未提供驻场服务专项方案"
|
||
}
|
||
],
|
||
"note": "驻场服务方案"
|
||
},
|
||
{
|
||
"id": "c20",
|
||
"cat": "scoring",
|
||
"points": "12",
|
||
"anchors": [
|
||
{
|
||
"p": 69,
|
||
"t": "与本项目类似的设备维保服务案"
|
||
},
|
||
{
|
||
"p": 69,
|
||
"t": "与本项目类似的安全服务案例"
|
||
},
|
||
{
|
||
"p": 69,
|
||
"t": "与本项目类似的专业运维服务案"
|
||
},
|
||
{
|
||
"p": 69,
|
||
"t": "与本项目类似的驻场服务案例"
|
||
},
|
||
{
|
||
"p": 69,
|
||
"t": "本项最多12分,业绩评分项中一个合同只能一次得分"
|
||
},
|
||
{
|
||
"p": 69,
|
||
"t": "以上须提供合同,合同须能反映项目名称"
|
||
}
|
||
],
|
||
"note": "供应商业绩:四类案例各最高3分"
|
||
},
|
||
{
|
||
"id": "c21",
|
||
"cat": "scoring",
|
||
"points": "2",
|
||
"anchors": [
|
||
{
|
||
"p": 69,
|
||
"t": "投标人具备ISO27001信息安全管理体系认证证书得2分"
|
||
}
|
||
],
|
||
"note": "ISO27001认证"
|
||
},
|
||
{
|
||
"id": "c22",
|
||
"cat": "scoring",
|
||
"points": "2",
|
||
"anchors": [
|
||
{
|
||
"p": 69,
|
||
"t": "投标人具备ISO9001质量管理体系认证证书得2分"
|
||
}
|
||
],
|
||
"note": "ISO9001认证"
|
||
},
|
||
{
|
||
"id": "c23",
|
||
"cat": "scoring",
|
||
"points": "2",
|
||
"anchors": [
|
||
{
|
||
"p": 69,
|
||
"t": "投标人具备ISO20000信息技术服务管理体系认证证书得2分"
|
||
}
|
||
],
|
||
"note": "ISO20000认证"
|
||
},
|
||
{
|
||
"id": "c24",
|
||
"cat": "scoring",
|
||
"points": "3",
|
||
"anchors": [
|
||
{
|
||
"p": 69,
|
||
"t": "为保障现场应急响应服务能力,如运维服务团队中,在不超过0.5小时"
|
||
},
|
||
{
|
||
"p": 69,
|
||
"t": "迅速抵达机房现场提供应急服务的应急人员为2人及以上的"
|
||
},
|
||
{
|
||
"p": 69,
|
||
"t": "(需提供承诺函或相关证明材料)"
|
||
}
|
||
],
|
||
"note": "0.5小时到场应急人员≥2人"
|
||
},
|
||
{
|
||
"id": "c25",
|
||
"cat": "scoring",
|
||
"points": "4",
|
||
"anchors": [
|
||
{
|
||
"p": 70,
|
||
"t": "项目经理具备高级工程师职称证书"
|
||
},
|
||
{
|
||
"p": 70,
|
||
"t": "ITSS的IT服务项目经理证书、信息系统项目管理师证书"
|
||
}
|
||
],
|
||
"note": "项目经理证书"
|
||
},
|
||
{
|
||
"id": "c26",
|
||
"cat": "scoring",
|
||
"points": "6",
|
||
"anchors": [
|
||
{
|
||
"p": 70,
|
||
"t": "技术负责人具备H3CIE(或HCIE或CCIE)证书"
|
||
},
|
||
{
|
||
"p": 70,
|
||
"t": "证书、CISP(或CSERE或CISAW)证书"
|
||
},
|
||
{
|
||
"p": 70,
|
||
"t": "项证书得3分,最多得"
|
||
}
|
||
],
|
||
"note": "技术负责人证书"
|
||
},
|
||
{
|
||
"id": "c27",
|
||
"cat": "scoring",
|
||
"points": "6",
|
||
"anchors": [
|
||
{
|
||
"p": 70,
|
||
"t": "驻场服务人员具备虚拟化认证证书、网络认证证书、CISP-PTE注册渗"
|
||
},
|
||
{
|
||
"p": 70,
|
||
"t": "透测试工程师证书,每提供一项得2分,最多得6分"
|
||
}
|
||
],
|
||
"note": "驻场人员证书"
|
||
},
|
||
{
|
||
"id": "c28",
|
||
"cat": "scoring",
|
||
"points": "4",
|
||
"anchors": [
|
||
{
|
||
"p": 70,
|
||
"t": "团队其他技术人员(非项目经理、技术负责人或驻场人员)具备虚拟化"
|
||
},
|
||
{
|
||
"p": 70,
|
||
"t": "术证书、软考类中级工程师证书,每具备一类证书得2分"
|
||
},
|
||
{
|
||
"p": 70,
|
||
"t": "一人多证不可重复得分"
|
||
}
|
||
],
|
||
"note": "其他技术人员证书"
|
||
},
|
||
{
|
||
"id": "d1",
|
||
"cat": "schedule",
|
||
"kind": "question_deadline",
|
||
"anchors": [
|
||
{
|
||
"p": 9,
|
||
"t": "应在磋商截止期五日前按采购公告中的通讯地址,以书面形式通知采购代理机构"
|
||
}
|
||
],
|
||
"note": "要求澄清须在磋商截止五日前书面提出"
|
||
},
|
||
{
|
||
"id": "d2",
|
||
"cat": "schedule",
|
||
"kind": "question_deadline",
|
||
"anchors": [
|
||
{
|
||
"p": 16,
|
||
"t": "可以在知道或应知其权益受到损害之日起七个工作日内"
|
||
}
|
||
],
|
||
"note": "质疑:知道或应知受损之日起7个工作日内"
|
||
},
|
||
{
|
||
"id": "d3",
|
||
"cat": "schedule",
|
||
"kind": "bid_deadline",
|
||
"anchors": [
|
||
{
|
||
"p": 6,
|
||
"t": "2026年11月13日14时30分(北京时间)"
|
||
}
|
||
],
|
||
"note": "提交响应文件截止时间"
|
||
},
|
||
{
|
||
"id": "d4",
|
||
"cat": "schedule",
|
||
"kind": "validity",
|
||
"anchors": [
|
||
{
|
||
"p": 10,
|
||
"t": "磋商有效期为采购公告规定的提交响应文件截止之日起六十天"
|
||
}
|
||
],
|
||
"note": "磋商有效期60天"
|
||
},
|
||
{
|
||
"id": "d5",
|
||
"cat": "schedule",
|
||
"kind": "deposit",
|
||
"anchors": [
|
||
{
|
||
"p": 6,
|
||
"t": "本次磋商不收取磋商保证金"
|
||
}
|
||
],
|
||
"note": "不收磋商保证金"
|
||
},
|
||
{
|
||
"id": "d6",
|
||
"cat": "schedule",
|
||
"kind": "submission",
|
||
"anchors": [
|
||
{
|
||
"p": 6,
|
||
"t": "需要办理江苏省政府采购数字证书及电子签章"
|
||
},
|
||
{
|
||
"p": 6,
|
||
"t": "进行注册,并制作上传电子响应文件"
|
||
},
|
||
{
|
||
"p": 10,
|
||
"t": "在采购公告规定的提交响应文件截止时间前制作并上传电子响应文件"
|
||
}
|
||
],
|
||
"note": "苏采云系统制作上传电子响应文件,办理CA"
|
||
},
|
||
{
|
||
"id": "d7",
|
||
"cat": "schedule",
|
||
"kind": "decryption",
|
||
"anchors": [
|
||
{
|
||
"p": 11,
|
||
"t": "在苏采云系统规定的时间内对响应文件进行解密"
|
||
},
|
||
{
|
||
"p": 13,
|
||
"t": "在苏采云系统规定的时间内未成功解密电子响应文件"
|
||
}
|
||
],
|
||
"note": "按系统规定时间解密"
|
||
},
|
||
{
|
||
"id": "d8",
|
||
"cat": "schedule",
|
||
"kind": "signature",
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "响应文件未按照磋商文件要求加盖电子公章"
|
||
}
|
||
],
|
||
"note": "响应文件须加盖电子公章"
|
||
},
|
||
{
|
||
"id": "d9",
|
||
"cat": "schedule",
|
||
"kind": "signature",
|
||
"anchors": [
|
||
{
|
||
"p": 12,
|
||
"t": "在苏采云系统中提交《澄清响应函》并加盖电子公章"
|
||
},
|
||
{
|
||
"p": 14,
|
||
"t": "系统提交《磋商响应函》并加盖电子公章"
|
||
},
|
||
{
|
||
"p": 14,
|
||
"t": "重新提交响应文件,并加盖电子公章"
|
||
},
|
||
{
|
||
"p": 14,
|
||
"t": "最后报价格式表须加盖电子公章"
|
||
}
|
||
],
|
||
"note": "澄清/磋商响应函/最后报价表加盖电子公章"
|
||
},
|
||
{
|
||
"id": "r-subs-p13s17",
|
||
"cat": "substantive",
|
||
"optional": true,
|
||
"added_in_review": true,
|
||
"anchors": [
|
||
{
|
||
"p": 13,
|
||
"t": "24.3.12法律法规及本磋商文"
|
||
}
|
||
],
|
||
"note": "兜底条,S01/S07记optional",
|
||
"basis": "explicit_invalid"
|
||
},
|
||
{
|
||
"id": "r-qual-p5s22",
|
||
"cat": "qualification",
|
||
"optional": true,
|
||
"added_in_review": true,
|
||
"anchors": [
|
||
{
|
||
"p": 5,
|
||
"t": "(二)本项目的特定资格要求:无。"
|
||
}
|
||
],
|
||
"note": "特定资格要求:无"
|
||
},
|
||
{
|
||
"id": "r-sche-p10s24",
|
||
"cat": "schedule",
|
||
"optional": true,
|
||
"added_in_review": true,
|
||
"anchors": [
|
||
{
|
||
"p": 10,
|
||
"t": "18.1提交响应文件截止时间后上"
|
||
}
|
||
],
|
||
"note": "截止后拒收;拿不准",
|
||
"kind": "bid_deadline"
|
||
},
|
||
{
|
||
"id": "t1",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 32,
|
||
"t": "提供7×24小时的技术支持服务"
|
||
}
|
||
],
|
||
"note": "7×24技术支持"
|
||
},
|
||
{
|
||
"id": "t2",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 32,
|
||
"t": "提供每月例行巡检服务,检测设备及系统运行情况"
|
||
}
|
||
],
|
||
"note": "每月例行巡检并出报告"
|
||
},
|
||
{
|
||
"id": "t3",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 32,
|
||
"t": "每月提供设备运行性能及分析报告"
|
||
}
|
||
],
|
||
"note": "每月性能分析报告及调优"
|
||
},
|
||
{
|
||
"id": "t4",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 32,
|
||
"t": "提供7×24小时的故障受理"
|
||
}
|
||
],
|
||
"note": "7×24故障受理"
|
||
},
|
||
{
|
||
"id": "t5",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 32,
|
||
"t": "故障服务的响应时间小于1小时"
|
||
}
|
||
],
|
||
"note": "故障响应<1小时"
|
||
},
|
||
{
|
||
"id": "t6",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 32,
|
||
"t": "采取应急措施或提供替代设备使业务系统尽快恢复运行"
|
||
}
|
||
],
|
||
"note": "无法短时恢复须应急或替代设备"
|
||
},
|
||
{
|
||
"id": "t7",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 32,
|
||
"t": "应于3日内向采购方提交书面报告"
|
||
},
|
||
{
|
||
"p": 32,
|
||
"t": "报告内容包括故障现象、原因,处理方法"
|
||
}
|
||
],
|
||
"note": "排障后3日内提交故障报告"
|
||
},
|
||
{
|
||
"id": "t8",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 32,
|
||
"t": "保证2小时内能到达故障现场"
|
||
}
|
||
],
|
||
"note": "重大故障7×24现场支援、2小时到场"
|
||
},
|
||
{
|
||
"id": "t9",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 32,
|
||
"t": "中标方应具有本地区备件库并保证采购方现场整备间内有指定备件"
|
||
}
|
||
],
|
||
"note": "本地区备件库、现场指定备件"
|
||
},
|
||
{
|
||
"id": "t10",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "建立数据中心安全运维知识库"
|
||
}
|
||
],
|
||
"note": "建立安全运维知识库"
|
||
},
|
||
{
|
||
"id": "t11",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "协助数据中心完成信息系统的信息安全等级保护定级"
|
||
}
|
||
],
|
||
"note": "协助等保定级备案测评整改"
|
||
},
|
||
{
|
||
"id": "t12",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "从各方(用户、厂商、集成商、运营商、中标方、软件开发商等)的职责赋予"
|
||
}
|
||
],
|
||
"note": "各方职责、流程、监管体系等安全服务"
|
||
},
|
||
{
|
||
"id": "t13",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "对近年发生的应急事件、软件漏洞、暴露的安全管理问题进行相关数据分析"
|
||
}
|
||
],
|
||
"note": "应急事件与漏洞数据分析总结"
|
||
},
|
||
{
|
||
"id": "t14",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "提供驻场安全运维服务详细工作移交方案"
|
||
}
|
||
],
|
||
"note": "工作移交方案与交接控制"
|
||
},
|
||
{
|
||
"id": "t15",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "综合分析近年市场上发生的各类安全问题根源"
|
||
}
|
||
],
|
||
"note": "分析安全问题根源提创新建议"
|
||
},
|
||
{
|
||
"id": "t16",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "驻场服务主要为数据中心提供网络与信息安全运维服务"
|
||
}
|
||
],
|
||
"note": "驻场提供网络与信息安全运维",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "t17",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "日常安全运维服务应包括但不限于安全巡检"
|
||
}
|
||
],
|
||
"note": "日常安全运维内容"
|
||
},
|
||
{
|
||
"id": "t18",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "中标方安排不少于2名专业技术服务人员进行本地驻场"
|
||
}
|
||
],
|
||
"note": "安全驻场不少于2人"
|
||
},
|
||
{
|
||
"id": "t19",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "每周提供《安全运维报告》"
|
||
}
|
||
],
|
||
"note": "每周安全运维报告、定期漏扫报告"
|
||
},
|
||
{
|
||
"id": "t20",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "日志要做到统一分析,包括安全设备"
|
||
}
|
||
],
|
||
"note": "日志统一分析"
|
||
},
|
||
{
|
||
"id": "t21",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "对报告中问题提出整改建议并配合实施"
|
||
}
|
||
],
|
||
"note": "提出整改建议并配合实施"
|
||
},
|
||
{
|
||
"id": "t22",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "服务的频率与周期应根据实际环境现状制定"
|
||
}
|
||
],
|
||
"note": "服务频率按实际制定",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "t23",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "形成一整套高效简洁的规范性文档、流程和制度"
|
||
}
|
||
],
|
||
"note": "形成规范性文档流程制度"
|
||
},
|
||
{
|
||
"id": "t24",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "每个月安排安全专家对数据中心安全进行评估并出具报告"
|
||
}
|
||
],
|
||
"note": "每月安全专家评估报告"
|
||
},
|
||
{
|
||
"id": "t25",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 37,
|
||
"t": "执行系统漏洞和威胁加固等工作"
|
||
}
|
||
],
|
||
"note": "安全加固服务(概述)",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "t26",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 41,
|
||
"t": "提供AI安全防护服务,能够进行防护规则自学习闭环"
|
||
}
|
||
],
|
||
"note": "AI安全防护服务,与态势感知联动"
|
||
},
|
||
{
|
||
"id": "t27",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 41,
|
||
"t": "完成采购方安排的其他相关工作"
|
||
}
|
||
],
|
||
"note": "完成采购方安排的其他工作",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "t28",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 41,
|
||
"t": "机房基础设施各系统的全部设施设备进行质保和维保"
|
||
}
|
||
],
|
||
"note": "机房基础设施全部设施质保维保"
|
||
},
|
||
{
|
||
"id": "t29",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 41,
|
||
"t": "进行维护保养、维修及更换配件和材料"
|
||
}
|
||
],
|
||
"note": "机房设施维保、配件材料免费提供"
|
||
},
|
||
{
|
||
"id": "t30",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 41,
|
||
"t": "三个机房设置高温声光报警输出"
|
||
}
|
||
],
|
||
"note": "三机房设高温声光报警"
|
||
},
|
||
{
|
||
"id": "t31",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 41,
|
||
"t": "负责四楼程控交换机室的格力空调的维护和保修"
|
||
}
|
||
],
|
||
"note": "四楼程控交换机室空调维保"
|
||
},
|
||
{
|
||
"id": "t32",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 46,
|
||
"t": "运维期内计划管理类信息系统逐步迁移至省政务云"
|
||
}
|
||
],
|
||
"note": "配合政务云迁移做网络配置数据交换"
|
||
},
|
||
{
|
||
"id": "t33",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 46,
|
||
"t": "配合省名师空中课堂平台做好网络配置等工作"
|
||
}
|
||
],
|
||
"note": "配合名师空中课堂网络配置"
|
||
},
|
||
{
|
||
"id": "t34",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 46,
|
||
"t": "提供数据中心运维其它相关内容和办公网运维服务"
|
||
}
|
||
],
|
||
"note": "提供办公网运维服务"
|
||
},
|
||
{
|
||
"id": "t35",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 46,
|
||
"t": "重要时期和紧急情况还要按照采购人需求提供相应服务"
|
||
}
|
||
],
|
||
"note": "重要时期按需提供服务",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "t36",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 46,
|
||
"t": "运维服务商须在省教育数据中心系统监控、系统维护、专家服务"
|
||
}
|
||
],
|
||
"note": "运维规划建议和技术咨询"
|
||
},
|
||
{
|
||
"id": "t37",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 46,
|
||
"t": "建立江苏省教育数据中心运维体系"
|
||
}
|
||
],
|
||
"note": "建立数据中心运维体系"
|
||
},
|
||
{
|
||
"id": "t38",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 46,
|
||
"t": "为数据中心整体系统运维提供规划、建议和技术咨询服务"
|
||
}
|
||
],
|
||
"note": "整体运维规划咨询"
|
||
},
|
||
{
|
||
"id": "t39",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 46,
|
||
"t": "签订合同后1个月内提供数据中心整体运维方案"
|
||
}
|
||
],
|
||
"note": "签约后1个月内提供整体运维方案"
|
||
},
|
||
{
|
||
"id": "t40",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 46,
|
||
"t": "建立运维管理体系,包括人员管理"
|
||
}
|
||
],
|
||
"note": "建立运维管理体系"
|
||
},
|
||
{
|
||
"id": "t41",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 46,
|
||
"t": "建立运维技术体系,覆盖基础设施"
|
||
}
|
||
],
|
||
"note": "建立运维技术体系"
|
||
},
|
||
{
|
||
"id": "t42",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 46,
|
||
"t": "针对不断发展的数据中心运维技术,以及服务采购方提出的要求"
|
||
}
|
||
],
|
||
"note": "持续提供技术咨询和建议"
|
||
},
|
||
{
|
||
"id": "t43",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 46,
|
||
"t": "建立维保服务规范和流程,针对基础设施"
|
||
}
|
||
],
|
||
"note": "建立维保服务规范和流程"
|
||
},
|
||
{
|
||
"id": "t44",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "协助制定及审核设施、设备、环境的运维方案"
|
||
}
|
||
],
|
||
"note": "协助制定审核运维方案"
|
||
},
|
||
{
|
||
"id": "t45",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "协助制定系统迁移、割接方案"
|
||
}
|
||
],
|
||
"note": "协助系统迁移割接"
|
||
},
|
||
{
|
||
"id": "t46",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "制定相应的设施设备和系统升级、调整或优化方案"
|
||
}
|
||
],
|
||
"note": "制定升级调整优化方案"
|
||
},
|
||
{
|
||
"id": "t47",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "及时响应并解决数据中心软硬件出现的故障"
|
||
}
|
||
],
|
||
"note": "及时响应解决软硬件故障"
|
||
},
|
||
{
|
||
"id": "t48",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "对于复杂故障,应派遣技术专家现场支持服务"
|
||
}
|
||
],
|
||
"note": "复杂故障专家现场支持、出分析报告"
|
||
},
|
||
{
|
||
"id": "t49",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "服务响应时间为服务提供商必须满足的必要条件"
|
||
}
|
||
],
|
||
"note": "响应时间为必要条件",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "t50",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "服务商需保证7*24小时无间断响应服务"
|
||
}
|
||
],
|
||
"note": "7×24无间断响应"
|
||
},
|
||
{
|
||
"id": "t51",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "4小时内2名及以上远程或现场日常响应"
|
||
}
|
||
],
|
||
"note": "日常响应:4小时内2名以上远程或现场"
|
||
},
|
||
{
|
||
"id": "t52",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "2小时内2名及以上远程或现场快速响应"
|
||
}
|
||
],
|
||
"note": "快速响应:2小时内2名以上远程或现场"
|
||
},
|
||
{
|
||
"id": "t53",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "0.5小时内3名及以上现场紧急响应"
|
||
}
|
||
],
|
||
"note": "紧急响应:0.5小时内3名以上现场"
|
||
},
|
||
{
|
||
"id": "t54",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "并按响应时间要求现场支持"
|
||
}
|
||
],
|
||
"note": "紧急响应按时现场支持",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "t55",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "服务提供商必须满足服务响应时间、人员配置的要求"
|
||
}
|
||
],
|
||
"note": "须满足响应时间与人员配置(斜体下划线)"
|
||
},
|
||
{
|
||
"id": "t56",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 50,
|
||
"t": "投标人须针对以上内容提供承诺函并加盖公章"
|
||
}
|
||
],
|
||
"note": "提供响应时间人员配置承诺函",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "t57",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 55,
|
||
"t": "有大型数据中心运维服务、数据维护经验"
|
||
}
|
||
],
|
||
"note": "团队有大型数据中心运维经验"
|
||
},
|
||
{
|
||
"id": "t58",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 55,
|
||
"t": "有较强的沟通能力以及灵活解决问题能力"
|
||
}
|
||
],
|
||
"note": "团队沟通和解决问题能力",
|
||
"optional": true
|
||
},
|
||
{
|
||
"id": "t59",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 55,
|
||
"t": "虚拟化维护人员具有虚拟化认证证书"
|
||
}
|
||
],
|
||
"note": "虚拟化人员持虚拟化认证"
|
||
},
|
||
{
|
||
"id": "t60",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 55,
|
||
"t": "网络维护人员具有网络认证证书"
|
||
}
|
||
],
|
||
"note": "网络人员持网络认证"
|
||
},
|
||
{
|
||
"id": "t61",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 55,
|
||
"t": "机房基础设施维护人员具备电气施工员或电气工程师证书"
|
||
}
|
||
],
|
||
"note": "基础设施人员持电气、制冷、消防证书"
|
||
},
|
||
{
|
||
"id": "t62",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 55,
|
||
"t": "未经服务采购方许可,技术支持人员不得随意变动"
|
||
}
|
||
],
|
||
"note": "技术支持人员不得随意变动"
|
||
},
|
||
{
|
||
"id": "t63",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 55,
|
||
"t": "必须严格按照服务采购方提供的技术需求文档制定实施方案"
|
||
}
|
||
],
|
||
"note": "按技术需求文档制定方案、经确认后实施"
|
||
},
|
||
{
|
||
"id": "t64",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 55,
|
||
"t": "运维的响应时间和处理时间要求按照下表"
|
||
},
|
||
{
|
||
"p": 55,
|
||
"t": "服务请求流程16112124136"
|
||
}
|
||
],
|
||
"note": "服务请求流程:响应1h,处理6/12/24/36h"
|
||
},
|
||
{
|
||
"id": "t65",
|
||
"cat": "tech_param",
|
||
"anchors": [
|
||
{
|
||
"p": 55,
|
||
"t": "运维的响应时间和处理时间要求按照下表"
|
||
},
|
||
{
|
||
"p": 55,
|
||
"t": "故障流程0.560.5120.5240.536"
|
||
}
|
||
],
|
||
"note": "故障流程:响应0.5h,处理6/12/24/36h"
|
||
},
|
||
{
|
||
"id": "r-subs-p84s7",
|
||
"cat": "substantive",
|
||
"optional": true,
|
||
"added_in_review": true,
|
||
"anchors": [
|
||
{
|
||
"p": 84,
|
||
"t": "3.供应商如不提供此声明函,不得"
|
||
}
|
||
],
|
||
"note": "同S01声明函注;拿不准",
|
||
"basis": "explicit_invalid"
|
||
}
|
||
]
|
||
}
|